Русские видео

Сейчас в тренде

Иностранные видео




Если кнопки скачивания не загрузились НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием, пожалуйста напишите в поддержку по адресу внизу страницы.
Спасибо за использование сервиса savevideohd.ru



Rishikesh Karanprayag Railway Line - Current Status (Part II)

Don't forget to watch Part I of Rishikesh Karanprayag Railway Line -    • Rishikesh Karanprayag Railway Line - ...   Part III of Rishikesh Karanprayag Railway Line -    • Rishikesh Karanprayag Railway Line - ...   The Rishikesh–Karanprayag Railway (Hindi: ऋषिकेश–कर्णप्रयाग रेलवे), will run from Rishikesh railway station to Karanprayag. It is Indian Railways' proposed route for the Char Dham Railway to connect to the Chota Char Dham. It is one of the initiatives of Modi Government to counter China's expansion. This 125 km route starts at New Rishikesh railway station at 380m AMSL and ends at Karanaprayag 825m AMSL, 16,200 crore 125 km project, will reduce Rishikesh to Karanprayag travel time from 7 hours to 2 hours. It will have 16 bridges and 105 km or 85% of the project inside tunnels. A 15.1 km tunnel, reported to be the country's longest, will be built between Devprayag and Lachmoli on the route. The design consultancy contracts for tunnel and bridge construction awarded in 2018-19 and construction shall start in 2019-20. Work for the first block section from Virbhadra Railway station to New Rishikesh station commenced in June 2018.

Comments