Русские видео

Сейчас в тренде

Иностранные видео


Скачать с ютуб Newly constructed Bridge 27 moves to NYMR from Cleveland Bridge by Class 66 No. 66137 в хорошем качестве

Newly constructed Bridge 27 moves to NYMR from Cleveland Bridge by Class 66 No. 66137 4 года назад


Если кнопки скачивания не загрузились НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием, пожалуйста напишите в поддержку по адресу внизу страницы.
Спасибо за использование сервиса savevideohd.ru



Newly constructed Bridge 27 moves to NYMR from Cleveland Bridge by Class 66 No. 66137

Friday 20th December 2019 Newly constructed Bridge 27 moves to the North Yorkshire Moors Railway to replace the 100 year old bridge at Goathland Station. The bridge was constructed at Cleveland Bridge in Darlington an moved to AV Dawson's at Middlesbrough. Class 66 No. 66137 transported the bridge to Grosmont Station on the NYMR. The NYMR's own Class 37 No. 37264 then moved the bridge from Grosmont to the bridge site at Goathland Station. The new Bridge 27 is due to be replaced during January 2020. Further information on the Bridge 27 replacement can be found here: https://www.nymr.co.uk/news/nymr-is-b... Cleveland Bridge: https://www.clevelandbridge.com/ Bridge 27 being loaded at Darlington, UK for transport to rail terminal at Middlesbrough    • CBUK load out,  Bridge 27 makes its w...   Volker Rail: https://www.volkerrail.co.uk/en/plant... Other Bridge 27 Updates: Update 1:    • Volker Bridge Cranes en Route to NYMR...   (New Bridge arrives at the North Yorkshire Moors Railway). Update 2:    • Volker Bridge Cranes en Route to NYMR...   (Class 37 No. 37264 shunts the new bridge into position at Goathland). Update 3:    • Bridge 27 removal at Goathland Statio...   (General bridge preparation). Update 4:    • Bridge 27 Update at Goathland (NYMR) ...   (Sill beams are lifted into position prior to the main bridge beams). Update 5:    • Bridge 27 (Update 5) at Goathland Sta...   (Main bridge beams are moved into position) Update 6:    • Bridge 27 Replacement Progress (Updat...   (works continues) Update 7:    • Bridge 27 (Update 7) at Goathland and...   (Bridge 27 update - steel reinforcement and Class 66 No 66113 departs with Kirow 1200 rail crane) Update 8:    • Bridge 27 (Update 8) at Goathland  

Comments