Русские видео

Сейчас в тренде

Иностранные видео


Скачать с ютуб CoGri Middle East - Wire Guidance Installation For Very Narrow Aisle Trucks (VNA) or AGV Systems в хорошем качестве

CoGri Middle East - Wire Guidance Installation For Very Narrow Aisle Trucks (VNA) or AGV Systems 5 лет назад


Если кнопки скачивания не загрузились НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием, пожалуйста напишите в поддержку по адресу внизу страницы.
Спасибо за использование сервиса savevideohd.ru



CoGri Middle East - Wire Guidance Installation For Very Narrow Aisle Trucks (VNA) or AGV Systems

CoGri Middle East LLC annually install in excess of 17,000m of wire guidance for Materials Handling Equipment (MHE) and Automatic Guided Vehicles (AGV’s). We offer our design & installation services throughout the GCC & wider region, supporting MHE suppliers & Clients directly. Project Process • 20 Seconds: The wire guidance positioning centrally to the aisle is critical for the safe & efficient operation of the MHE/AGV. The rack to rack distance is measured at regular intervals down the aisle to record any variances and adjust the wire position accordingly. • 30 Seconds: A chalk line is used to mark a continuous line down the aisle, connecting all the centre marks made earlier. • 45 Seconds: Where the wire will intersect with a saw cut/construction joint, the cut/joint is filled with a suitable joint sealant. This protects the wire once operational. • 1 Minute: The wire cut is installed by a 2 man team. One man to operate the floor saw and one to immediately vacuum up the cutting residue. The wet cutting process eliminates any dust creation. • 1 Minute 12 Seconds: The depth if the cut is routinely checked by the team to ensure a constant cut depth is produced. A constant cut depth means the wire will remain at the specified desired distance below the floor surface – producing a consistent signal strength for the MHE/AGV. • 1 Minute 28 Seconds: If power supply is an issue on site, we can use our own small mobile generator. This means the wire installation team are self-sufficient and do not hinder any other ongoing operations. • 1 Minute 45 Seconds: Once all cutting is finished, the wire is rolled out and dropped in to the cut. • 1 Minute 55 Seconds: Where required, wires are joined professionally using solder and heat shrink. • 2 Minutes 15 Seconds: Sealant is mixed in the containers supplied. This is a clean & safe process. • 2 Minutes 30 Seconds: After being poured in to the dispensing gun, the sealant is applied to the cut to seal the wire in to the groove. • 2 Minutes 40 Seconds: Any excess sealant is removed, leaving a smooth finish level with the floor level. • 2 Minutes 50 Seconds: At the wall position where the line driver/frequency will be located, the wire is passed through a protective conduit and this is then fixed securely to the wall. • 3 Minutes: Before being connected to the line driver/frequency generator, the continuity and resistance is verified & recorded. https://cogrimiddleeast.com/

Comments