У нас вы можете посмотреть бесплатно Mullaperiyar Dam Water Level Today | sicp или скачать в максимальном доступном качестве, которое было загружено на ютуб. Для скачивания выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса savevideohd.ru
Mullaperiyar Dam Water Level Today | sicp Mullaiperiyar Dam is a masonry gravity dam on the Periyar River in the Indian state of Kerala It is located 881 m (2,890 ft) above mean sea level, on the Cardamom Hills of the Western Ghats in Thekkady, Idukki District of Kerala, South India. It was constructed between 1887 and 1895 by John Pennycuick and also reached in an agreement to divert water eastwards to the Madras Presidency area (present-day Tamil Nadu). It has a height of 53.6 m (176 ft) from the foundation, and a length of 365.7 m (1,200 ft). The Periyar National Park in Thekkady is located around the dam's reservoir. The dam is located in Kerala on the river Periyar, but is operated and maintained by Tamilnadu state. Although the Periyar River has a total catchment area of 5398 km2 with 114 km2 in Tamil Nadu, the catchment area of the Mullaperiyar Dam itself lies entirely in Kerala. On 21 November 2014, the water level hit 142 feet for first time in 35 years. The reservoir again hit the maximum limit of 142 feet on 15 August 2018, following incessant rains in the state of Kerala. This section needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Earlier known as the Periyaru Dam as it was basically meant to dam the Periyaru river, the present name Mullaperiyar is derived by vaguely blending the names of Mullayar River and Periyaru River, at the confluence of which the dam is located below. The Periyaru river which flows westward of kerala Arabian sea was diverted eastwards to flow towards the Bay of Bengal to provide water to the arid rain shadow region of Madurai in Madras Presidency which was in dire need of a greater supply of water than the small Vaigai River could provide. The dam created the Periyar Thekkady reservoir, from which water was diverted eastwards via a tunnel to augment the small flow of the Vaigai River. The Vaigai was dammed by the Vaigai Dam to provide a source for irrigating large tracts around Madurai. Initially the dam waters were used only for the irrigation of 68,558 ha (169,411 acres). Currently, the water from the Periyaru (Thekkady) Lake created by the dam, is diverted through the water shed cutting and a tunnel to Forebay Dam near Kumily (Iraichalpalam). From the Forebay dam, hydel pipe lines carry the water to the Periyar Power Station in Lower Periyaru. This is used for power generation (180 MW capacity) in the Periyar Power Station. From the Periyar Power Station, the water is let out into Vairavanar river and then to Suruliyar and from Suruliyar to Vaigai Dam. The Mullaperiyar Dam is a gravity dam made with concrete prepared from limestone and "surkhi" (burnt brick powder), and faced with rubble. Gravity dams use their weight and the force of gravity to support the reservoir and remain stable. The main dam has a maximum height of 53.6 m (176 ft) and length of 365.7 m (1,200 ft). Its crest is 3.6 m (12 ft) wide while the base has a width of 42.2 m (138 ft). It consists of a main dam, spillway on its left and an auxiliary dam (or "baby dam") to the right. Its reservoir can withhold 443,230,000 m3 (359,332 acre⋅ft) of water, of which 299,130,000 m3 (242,509 acre⋅ft) is active (live) storage. The unique idea of harnessing the westward flowing water of the Periyar river and diverting it to the eastward flowing Vaigai river was first explored in 1789 by Pradani Muthirulappa Pillai, a minister of the Ramnad king Muthuramalinga Sethupathy, who gave it up as he found it to be expensive. The location of the dam had first been scouted by Captain J. L. Caldwell, Madras Engineers (abbreviated as M.E.) in 1808 to reconnoitre the feasibility of providing water from the Periyar river to Madurai by a tunnel through the mountains. Caldwell discovered that the excavation needed would be in excess of 100 feet in depth and the project was abandoned with the comment in his report as "decidedly chimerical and unworthy of any further regard". The first attempt at damming the Periyaar with an earthen dam in 1850 was given up due to demands for higher wages by the labour citing unhealthy living conditions. The proposal was resubmitted a number of times and in 1862, Captain J. G. Ryves, M.E., carried out a study and submitted proposals in 1867 for another earthwork dam, 62 feet high. The matter was debated by the Madras Government and the matter further delayed by the terrible famine of 1876–77. Finally, in 1882. This News Covered From Theni District Reporter (Tamil ) From South Indian Crime Point Weekly. For More Details Pl Visit : http://www.southindiancrimepoint.com/ or http://sicp.co.in or http://sicp.in or / crimepoint or / crimepoint or https://south-indian-crime-point-webt...